Multiple Job steps using same variable or one temp table

I need a constant to be available in multiple steps of a job (more
specifically, getdate() from step one). I tried storing it in a variable or
temp table but when I get to step two of the job and try to retrieve the
value, I get "must declare variable..." or "table does not exist" (depending
on which method I am testing).
I did a little test and the SPID in each one of the steps is the same so
shouldn't the temp table be accessible from all steps?
A profiler trace reveals that Agent does a logout and login. What you are seeing is the same spid
number being reused. As Agent won't execute the same job simultaneously, why not use a permanent
table?
Tibor Karaszi, SQL Server MVP
http://www.karaszi.com/sqlserver/default.asp
http://www.solidqualitylearning.com/
"DBA72" <DBA72@.discussions.microsoft.com> wrote in message
news:0B9550DB-C93F-42FD-AB5D-670049929375@.microsoft.com...
>I need a constant to be available in multiple steps of a job (more
> specifically, getdate() from step one). I tried storing it in a variable or
> temp table but when I get to step two of the job and try to retrieve the
> value, I get "must declare variable..." or "table does not exist" (depending
> on which method I am testing).
> I did a little test and the SPID in each one of the steps is the same so
> shouldn't the temp table be accessible from all steps?
|||Initially, my main reason for not using a permanent table is that I will need
to drop it at the end and if step 2 fails and the table gets dropped in step
3 then it won't get dropped.
I could modify step 2 to continue on to step 3 even if it fails but then
the job will show as completed succesfully even if step two failed.
Maybe I will just use a permanent table and keep it so that I don't need to
drop it at the end...
"Tibor Karaszi" wrote:

> A profiler trace reveals that Agent does a logout and login. What you are seeing is the same spid
> number being reused. As Agent won't execute the same job simultaneously, why not use a permanent
> table?
> --
> Tibor Karaszi, SQL Server MVP
> http://www.karaszi.com/sqlserver/default.asp
> http://www.solidqualitylearning.com/
>
> "DBA72" <DBA72@.discussions.microsoft.com> wrote in message
> news:0B9550DB-C93F-42FD-AB5D-670049929375@.microsoft.com...
>
>
|||> Maybe I will just use a permanent table and keep it so that I don't need to
> drop it at the end...
That is what I would do.

> Initially, my main reason for not using a permanent table is that I will need
> to drop it at the end and if step 2 fails and the table gets dropped in step
> 3 then it won't get dropped.
> I could modify step 2 to continue on to step 3 even if it fails but then
> the job will show as completed successfully even if step two failed.
Have two finishing steps. If step 2 fails, goto step 4 which drops the table and returns fails
status whether step 4 is OK or not...
Tibor Karaszi, SQL Server MVP
http://www.karaszi.com/sqlserver/default.asp
http://www.solidqualitylearning.com/
"DBA72" <DBA72@.discussions.microsoft.com> wrote in message
news:FBFC6287-C3C4-47C3-A58F-9AF3B373E3D7@.microsoft.com...[vbcol=seagreen]
> Initially, my main reason for not using a permanent table is that I will need
> to drop it at the end and if step 2 fails and the table gets dropped in step
> 3 then it won't get dropped.
> I could modify step 2 to continue on to step 3 even if it fails but then
> the job will show as completed succesfully even if step two failed.
> Maybe I will just use a permanent table and keep it so that I don't need to
> drop it at the end...
> "Tibor Karaszi" wrote:

Multiple Job steps using same variable or one temp table

I need a constant to be available in multiple steps of a job (more
specifically, getdate() from step one). I tried storing it in a variable or
temp table but when I get to step two of the job and try to retrieve the
value, I get "must declare variable..." or "table does not exist" (depending
on which method I am testing).
I did a little test and the SPID in each one of the steps is the same so
shouldn't the temp table be accessible from all steps?A profiler trace reveals that Agent does a logout and login. What you are seeing is the same spid
number being reused. As Agent won't execute the same job simultaneously, why not use a permanent
table?
--
Tibor Karaszi, SQL Server MVP
http://www.karaszi.com/sqlserver/default.asp
http://www.solidqualitylearning.com/
"DBA72" <DBA72@.discussions.microsoft.com> wrote in message
news:0B9550DB-C93F-42FD-AB5D-670049929375@.microsoft.com...
>I need a constant to be available in multiple steps of a job (more
> specifically, getdate() from step one). I tried storing it in a variable or
> temp table but when I get to step two of the job and try to retrieve the
> value, I get "must declare variable..." or "table does not exist" (depending
> on which method I am testing).
> I did a little test and the SPID in each one of the steps is the same so
> shouldn't the temp table be accessible from all steps?|||Initially, my main reason for not using a permanent table is that I will need
to drop it at the end and if step 2 fails and the table gets dropped in step
3 then it won't get dropped.
I could modify step 2 to continue on to step 3 even if it fails but then
the job will show as completed succesfully even if step two failed.
Maybe I will just use a permanent table and keep it so that I don't need to
drop it at the end...
"Tibor Karaszi" wrote:
> A profiler trace reveals that Agent does a logout and login. What you are seeing is the same spid
> number being reused. As Agent won't execute the same job simultaneously, why not use a permanent
> table?
> --
> Tibor Karaszi, SQL Server MVP
> http://www.karaszi.com/sqlserver/default.asp
> http://www.solidqualitylearning.com/
>
> "DBA72" <DBA72@.discussions.microsoft.com> wrote in message
> news:0B9550DB-C93F-42FD-AB5D-670049929375@.microsoft.com...
> >I need a constant to be available in multiple steps of a job (more
> > specifically, getdate() from step one). I tried storing it in a variable or
> > temp table but when I get to step two of the job and try to retrieve the
> > value, I get "must declare variable..." or "table does not exist" (depending
> > on which method I am testing).
> >
> > I did a little test and the SPID in each one of the steps is the same so
> > shouldn't the temp table be accessible from all steps?
>
>|||> Maybe I will just use a permanent table and keep it so that I don't need to
> drop it at the end...
That is what I would do.
> Initially, my main reason for not using a permanent table is that I will need
> to drop it at the end and if step 2 fails and the table gets dropped in step
> 3 then it won't get dropped.
> I could modify step 2 to continue on to step 3 even if it fails but then
> the job will show as completed successfully even if step two failed.
Have two finishing steps. If step 2 fails, goto step 4 which drops the table and returns fails
status whether step 4 is OK or not...
--
Tibor Karaszi, SQL Server MVP
http://www.karaszi.com/sqlserver/default.asp
http://www.solidqualitylearning.com/
"DBA72" <DBA72@.discussions.microsoft.com> wrote in message
news:FBFC6287-C3C4-47C3-A58F-9AF3B373E3D7@.microsoft.com...
> Initially, my main reason for not using a permanent table is that I will need
> to drop it at the end and if step 2 fails and the table gets dropped in step
> 3 then it won't get dropped.
> I could modify step 2 to continue on to step 3 even if it fails but then
> the job will show as completed succesfully even if step two failed.
> Maybe I will just use a permanent table and keep it so that I don't need to
> drop it at the end...
> "Tibor Karaszi" wrote:
>> A profiler trace reveals that Agent does a logout and login. What you are seeing is the same spid
>> number being reused. As Agent won't execute the same job simultaneously, why not use a permanent
>> table?
>> --
>> Tibor Karaszi, SQL Server MVP
>> http://www.karaszi.com/sqlserver/default.asp
>> http://www.solidqualitylearning.com/
>>
>> "DBA72" <DBA72@.discussions.microsoft.com> wrote in message
>> news:0B9550DB-C93F-42FD-AB5D-670049929375@.microsoft.com...
>> >I need a constant to be available in multiple steps of a job (more
>> > specifically, getdate() from step one). I tried storing it in a variable or
>> > temp table but when I get to step two of the job and try to retrieve the
>> > value, I get "must declare variable..." or "table does not exist" (depending
>> > on which method I am testing).
>> >
>> > I did a little test and the SPID in each one of the steps is the same so
>> > shouldn't the temp table be accessible from all steps?
>>

Multiple Job Steps SQL 2000

Hi,
I have 3 DTS packages I want to run after each other, in no particular
order.
I have x3 jobs, each running one of the DTS using CmdExec.
I don't want to run these jobs on individual schedules. I also don't want a
single DTS package with x3 steps to achieve the same thing.
I want visibility of Status etc available in the SQL EM Job view for each of
the jobs.
I created a single multi-step job, with each step invoking a DTS package
using CmdExec. This works but then the individual jobs are redundant and the
level of job status visibility is lost.
I created a single multi-step job, with each step using T-SQL and
sp_start_job. Now this ran the jobs and gave visibility of their individual
status but the jobs did not run synchronously. They all started together.
How can I write a single 'wrapper' job to start one job and wait for it to
complete before starting the next job? This allows me to maintain a single
schedule and yet see x3 status indicators?
ThanksCreate an another package , with three Execute Sql Task, and use work flow to
execute each task only after success so that it wont run synchronously.
Thanks,
Sree
"Gramps" wrote:
> Hi,
> I have 3 DTS packages I want to run after each other, in no particular
> order.
> I have x3 jobs, each running one of the DTS using CmdExec.
> I don't want to run these jobs on individual schedules. I also don't want a
> single DTS package with x3 steps to achieve the same thing.
> I want visibility of Status etc available in the SQL EM Job view for each of
> the jobs.
>
> I created a single multi-step job, with each step invoking a DTS package
> using CmdExec. This works but then the individual jobs are redundant and the
> level of job status visibility is lost.
> I created a single multi-step job, with each step using T-SQL and
> sp_start_job. Now this ran the jobs and gave visibility of their individual
> status but the jobs did not run synchronously. They all started together.
>
> How can I write a single 'wrapper' job to start one job and wait for it to
> complete before starting the next job? This allows me to maintain a single
> schedule and yet see x3 status indicators?
> Thanks
>
>

Multiple Job Steps SQL 2000

Hi,
I have 3 DTS packages I want to run after each other, in no particular
order.
I have x3 jobs, each running one of the DTS using CmdExec.
I don't want to run these jobs on individual schedules. I also don't want a
single DTS package with x3 steps to achieve the same thing.
I want visibility of Status etc available in the SQL EM Job view for each of
the jobs.
I created a single multi-step job, with each step invoking a DTS package
using CmdExec. This works but then the individual jobs are redundant and the
level of job status visibility is lost.
I created a single multi-step job, with each step using T-SQL and
sp_start_job. Now this ran the jobs and gave visibility of their individual
status but the jobs did not run synchronously. They all started together.
How can I write a single 'wrapper' job to start one job and wait for it to
complete before starting the next job? This allows me to maintain a single
schedule and yet see x3 status indicators?
Thanks
Create an another package , with three Execute Sql Task, and use work flow to
execute each task only after success so that it wont run synchronously.
Thanks,
Sree
"Gramps" wrote:

> Hi,
> I have 3 DTS packages I want to run after each other, in no particular
> order.
> I have x3 jobs, each running one of the DTS using CmdExec.
> I don't want to run these jobs on individual schedules. I also don't want a
> single DTS package with x3 steps to achieve the same thing.
> I want visibility of Status etc available in the SQL EM Job view for each of
> the jobs.
>
> I created a single multi-step job, with each step invoking a DTS package
> using CmdExec. This works but then the individual jobs are redundant and the
> level of job status visibility is lost.
> I created a single multi-step job, with each step using T-SQL and
> sp_start_job. Now this ran the jobs and gave visibility of their individual
> status but the jobs did not run synchronously. They all started together.
>
> How can I write a single 'wrapper' job to start one job and wait for it to
> complete before starting the next job? This allows me to maintain a single
> schedule and yet see x3 status indicators?
> Thanks
>
>
sql

Multiple Job Steps SQL 2000

Hi,
I have 3 DTS packages I want to run after each other, in no particular
order.
I have x3 jobs, each running one of the DTS using CmdExec.
I don't want to run these jobs on individual schedules. I also don't want a
single DTS package with x3 steps to achieve the same thing.
I want visibility of Status etc available in the SQL EM Job view for each of
the jobs.
I created a single multi-step job, with each step invoking a DTS package
using CmdExec. This works but then the individual jobs are redundant and the
level of job status visibility is lost.
I created a single multi-step job, with each step using T-SQL and
sp_start_job. Now this ran the jobs and gave visibility of their individual
status but the jobs did not run synchronously. They all started together.
How can I write a single 'wrapper' job to start one job and wait for it to
complete before starting the next job? This allows me to maintain a single
schedule and yet see x3 status indicators?
ThanksCreate an another package , with three Execute Sql Task, and use work flow t
o
execute each task only after success so that it wont run synchronously.
Thanks,
Sree
"Gramps" wrote:

> Hi,
> I have 3 DTS packages I want to run after each other, in no particular
> order.
> I have x3 jobs, each running one of the DTS using CmdExec.
> I don't want to run these jobs on individual schedules. I also don't want
a
> single DTS package with x3 steps to achieve the same thing.
> I want visibility of Status etc available in the SQL EM Job view for each
of
> the jobs.
>
> I created a single multi-step job, with each step invoking a DTS package
> using CmdExec. This works but then the individual jobs are redundant and t
he
> level of job status visibility is lost.
> I created a single multi-step job, with each step using T-SQL and
> sp_start_job. Now this ran the jobs and gave visibility of their individua
l
> status but the jobs did not run synchronously. They all started together.
>
> How can I write a single 'wrapper' job to start one job and wait for it to
> complete before starting the next job? This allows me to maintain a single
> schedule and yet see x3 status indicators?
> Thanks
>
>

Multiple job steps

I am creating jobs using SQL Server Agent, the job has multiple steps.
Example
Step1 creates tables
Step2 creates group of reports to be executed only when step 1 is successful
l
Step3 creates group of reports to be executed only when step 1 is successful
l
I would like to execute step2 and step3 at the same time, step 3 is not depe
nding on step2.
How I do that? I am thinking of creating another job to execute step3 after
evaluating the status of step1,
somebody has more efficient ideas?
Thanks,One way would be to use DTS and it's workflow engine. You can run sql tasks
conditionally or at the same time.
Ray Higdon MCSE, MCDBA, CCNA
--
"Tony-ICW Group" <tmangahas@.icwgroup.com> wrote in message
news:CCB3CD33-DDFC-4E8B-9324-774A90F7A5EB@.microsoft.com...
> I am creating jobs using SQL Server Agent, the job has multiple steps.
> Example
> Step1 creates tables
> Step2 creates group of reports to be executed only when step 1 is
successfull
> Step3 creates group of reports to be executed only when step 1 is
successfull
> I would like to execute step2 and step3 at the same time, step 3 is not
depending on step2.
> How I do that? I am thinking of creating another job to execute step3
after evaluating the status of step1,
> somebody has more efficient ideas?
> Thanks,
>|||Thanks Ray...I will try that.

Friday, March 23, 2012

Multiple FTP tasks that connect to same server at same time error

I have this job that download 4 files once a month from the same server. The files are sizable and I need to download them in less than 5 hours total. In 2000 I use an active x script to generate the ftp script then execute the script. all four files download at the same time in 4 different tasks with no issues.

I am rewrote the process in 2005 so that it uses the IS FTP function but when all 4 ftp tasks kick off they all fail... instantly. the initially shared the same FTP connection manager so I created different ones for each and still the same result

the error is one that relates to changing directories.... Now if I just run one of the tasks it runs fine it is just when more than one try to run at once. I ended up putting in 10 second delays between each ftp task kicking off and it works just fine...

Does this sound like a bug?

Also... I am on SQL 2005 Enterprise SP1 on Windows 2003 enterprise SP1.

I can also reproduce the problem when multiple FTP tasks share the same FTP connection manager. But everything works fine if I create individual FTP connection manager for each task. This does sound like a bug to me so I am going to log a bug issue. We will investigate the problem and address it ASAP. Thanks you|||Thanks...

Wednesday, March 21, 2012

Multiple Files

I have a job with a single step that executes a stored procedure that performs the following steps:

1. Checks for the existance of a file A in a folder A

2. If it exists,

a. executes the cmdshell to run a DTS package to drop a table, recreate it and load the data in the file A to table X

b. runs other stored procedures that use the data in table X to create other tables Y and Z

c. executes the cndshell to remove and rename the file A from Folder A into Folder B

What I'd like to do is use this same stored procedure if possible, but create a job or another store procedure that would loop thru and process multiple files in Folder A instead of just one.

Any suggestions would be greatly appreciated

My post in this thread should point you in a workable direction.

Saturday, February 25, 2012

Multiple backup job schedules for one database to different devices

I want to know if it is possible to create backups on differnet
schedules of the same database? And if not, if there some solution
that can fit what I am trying to do?
I want to backup more aggressively to a locally attached disk, and less
aggressively to a network device. Specifically a virtual device in SQL
server using NetBackup SQL Connectors. For example, can we have a
backup schedule that creates a dull backup of a database everyday, and
have TLog backups every 30 minutes both to local disk. But we also
want to have a seperate schedule for the network device that does a
weekly fully, and say hourly differentials or TLog backups thru the
week. Would the checkpointing done by the BACKUP commands somehow
clobber one another?
It would be like:
Monday:
3:00AM - Full Backup -> Local Disk (daily)
3:30AM - TLog Backup -> Local Disk
4:00AM - Full Backup -> Network Disk (weekly)
4:00AM - TLog Backup -> Local Disk
4:30AM - TLog Backup -> Local Disk
5:00AM - TLog Backup -> Network Disk
5:00AM - TLog Backup -> Local Disk
5:30AM - TLog Backup -> Local Disk
6:00AM - TLog Backup -> Network Disk
6:00AM - TLog Backup -> Local Disk
....
Tuesday:
3:00AM - Full Backup -> Local Disk (daily)
3:30AM - TLog Backup -> Local Disk
4:00AM - TLog Backup -> Network Disk
4:00AM - TLog Backup -> Local Disk
4:30AM - TLog Backup -> Local Disk
5:00AM - TLog Backup -> Network Disk
...
I don't think this will work, but could it? And if not, would a
differential backup work for the Network Disk? The goal is to minimize
bandwidth because we can't backup several hundred gigabytes every
morning to a remote site. But we need near live backups incase we had
a total meltdown at the other site.
Regards,
--
Mike BrancatoHi Mike
You probably don't want to do this, as it would make finding the necessary
files when rolling forward the transaction log more difficult. You may want
to consider the alternative of always backing up to local disc and then
selectively copy to the network drive (all log backups) when required.
To get uneven intervals you can schedule your backup jobs to have multiple
schedules one for each period, although this would not overcome the change of
backup device or backup type.
John
"mike.brancato@.acs-inc.com" wrote:
> I want to know if it is possible to create backups on differnet
> schedules of the same database? And if not, if there some solution
> that can fit what I am trying to do?
> I want to backup more aggressively to a locally attached disk, and less
> aggressively to a network device. Specifically a virtual device in SQL
> server using NetBackup SQL Connectors. For example, can we have a
> backup schedule that creates a dull backup of a database everyday, and
> have TLog backups every 30 minutes both to local disk. But we also
> want to have a seperate schedule for the network device that does a
> weekly fully, and say hourly differentials or TLog backups thru the
> week. Would the checkpointing done by the BACKUP commands somehow
> clobber one another?
> It would be like:
> Monday:
> 3:00AM - Full Backup -> Local Disk (daily)
> 3:30AM - TLog Backup -> Local Disk
> 4:00AM - Full Backup -> Network Disk (weekly)
> 4:00AM - TLog Backup -> Local Disk
> 4:30AM - TLog Backup -> Local Disk
> 5:00AM - TLog Backup -> Network Disk
> 5:00AM - TLog Backup -> Local Disk
> 5:30AM - TLog Backup -> Local Disk
> 6:00AM - TLog Backup -> Network Disk
> 6:00AM - TLog Backup -> Local Disk
> .....
> Tuesday:
> 3:00AM - Full Backup -> Local Disk (daily)
> 3:30AM - TLog Backup -> Local Disk
> 4:00AM - TLog Backup -> Network Disk
> 4:00AM - TLog Backup -> Local Disk
> 4:30AM - TLog Backup -> Local Disk
> 5:00AM - TLog Backup -> Network Disk
> ...
> I don't think this will work, but could it? And if not, would a
> differential backup work for the Network Disk? The goal is to minimize
> bandwidth because we can't backup several hundred gigabytes every
> morning to a remote site. But we need near live backups incase we had
> a total meltdown at the other site.
> Regards,
> --
> Mike Brancato
>|||The problem with copying the local files is that the SQL backup process
may take a while and hold a lock on the large databse files. also, the
local backups are several hundred gigs every day, but we would like to
backup remotely only Tlogs, etc thru the week becasue we cannot handle
that much bacndwidth from our servers every day.
Is there any way of doing this?
John Bell wrote:
> Hi Mike
> You probably don't want to do this, as it would make finding the necessary
> files when rolling forward the transaction log more difficult. You may want
> to consider the alternative of always backing up to local disc and then
> selectively copy to the network drive (all log backups) when required.
> To get uneven intervals you can schedule your backup jobs to have multiple
> schedules one for each period, although this would not overcome the change of
> backup device or backup type.
> John
> "mike.brancato@.acs-inc.com" wrote:
> > I want to know if it is possible to create backups on differnet
> > schedules of the same database? And if not, if there some solution
> > that can fit what I am trying to do?
> >
> > I want to backup more aggressively to a locally attached disk, and less
> > aggressively to a network device. Specifically a virtual device in SQL
> > server using NetBackup SQL Connectors. For example, can we have a
> > backup schedule that creates a dull backup of a database everyday, and
> > have TLog backups every 30 minutes both to local disk. But we also
> > want to have a seperate schedule for the network device that does a
> > weekly fully, and say hourly differentials or TLog backups thru the
> > week. Would the checkpointing done by the BACKUP commands somehow
> > clobber one another?
> >
> > It would be like:
> >
> > Monday:
> > 3:00AM - Full Backup -> Local Disk (daily)
> > 3:30AM - TLog Backup -> Local Disk
> > 4:00AM - Full Backup -> Network Disk (weekly)
> > 4:00AM - TLog Backup -> Local Disk
> > 4:30AM - TLog Backup -> Local Disk
> > 5:00AM - TLog Backup -> Network Disk
> > 5:00AM - TLog Backup -> Local Disk
> > 5:30AM - TLog Backup -> Local Disk
> > 6:00AM - TLog Backup -> Network Disk
> > 6:00AM - TLog Backup -> Local Disk
> > .....
> > Tuesday:
> > 3:00AM - Full Backup -> Local Disk (daily)
> > 3:30AM - TLog Backup -> Local Disk
> > 4:00AM - TLog Backup -> Network Disk
> > 4:00AM - TLog Backup -> Local Disk
> > 4:30AM - TLog Backup -> Local Disk
> > 5:00AM - TLog Backup -> Network Disk
> > ...
> >
> > I don't think this will work, but could it? And if not, would a
> > differential backup work for the Network Disk? The goal is to minimize
> > bandwidth because we can't backup several hundred gigabytes every
> > morning to a remote site. But we need near live backups incase we had
> > a total meltdown at the other site.
> >
> > Regards,
> >
> > --
> > Mike Brancato
> >
> >|||Hi
With multiple jobs and schedules you can do just about anything. If you have
a highspeed dedicated lan between the backup server and your database server
it should not cause too much of a problem. Without trying it you will not
know!
If you have a dedicated backup server with high speed dedicated lan it may
be better to do everything to the backup server rather than the local server!
You database will not be "locked" while you are backing up.
SAN technologies have methods that can move large volumes of data instantly,
if you are looking at significant amounts of data it would probably worth
investigating this option.
John
"mike.brancato@.acs-inc.com" wrote:
> The problem with copying the local files is that the SQL backup process
> may take a while and hold a lock on the large databse files. also, the
> local backups are several hundred gigs every day, but we would like to
> backup remotely only Tlogs, etc thru the week becasue we cannot handle
> that much bacndwidth from our servers every day.
> Is there any way of doing this?
> John Bell wrote:
> > Hi Mike
> >
> > You probably don't want to do this, as it would make finding the necessary
> > files when rolling forward the transaction log more difficult. You may want
> > to consider the alternative of always backing up to local disc and then
> > selectively copy to the network drive (all log backups) when required.
> >
> > To get uneven intervals you can schedule your backup jobs to have multiple
> > schedules one for each period, although this would not overcome the change of
> > backup device or backup type.
> >
> > John
> >
> > "mike.brancato@.acs-inc.com" wrote:
> >
> > > I want to know if it is possible to create backups on differnet
> > > schedules of the same database? And if not, if there some solution
> > > that can fit what I am trying to do?
> > >
> > > I want to backup more aggressively to a locally attached disk, and less
> > > aggressively to a network device. Specifically a virtual device in SQL
> > > server using NetBackup SQL Connectors. For example, can we have a
> > > backup schedule that creates a dull backup of a database everyday, and
> > > have TLog backups every 30 minutes both to local disk. But we also
> > > want to have a seperate schedule for the network device that does a
> > > weekly fully, and say hourly differentials or TLog backups thru the
> > > week. Would the checkpointing done by the BACKUP commands somehow
> > > clobber one another?
> > >
> > > It would be like:
> > >
> > > Monday:
> > > 3:00AM - Full Backup -> Local Disk (daily)
> > > 3:30AM - TLog Backup -> Local Disk
> > > 4:00AM - Full Backup -> Network Disk (weekly)
> > > 4:00AM - TLog Backup -> Local Disk
> > > 4:30AM - TLog Backup -> Local Disk
> > > 5:00AM - TLog Backup -> Network Disk
> > > 5:00AM - TLog Backup -> Local Disk
> > > 5:30AM - TLog Backup -> Local Disk
> > > 6:00AM - TLog Backup -> Network Disk
> > > 6:00AM - TLog Backup -> Local Disk
> > > .....
> > > Tuesday:
> > > 3:00AM - Full Backup -> Local Disk (daily)
> > > 3:30AM - TLog Backup -> Local Disk
> > > 4:00AM - TLog Backup -> Network Disk
> > > 4:00AM - TLog Backup -> Local Disk
> > > 4:30AM - TLog Backup -> Local Disk
> > > 5:00AM - TLog Backup -> Network Disk
> > > ...
> > >
> > > I don't think this will work, but could it? And if not, would a
> > > differential backup work for the Network Disk? The goal is to minimize
> > > bandwidth because we can't backup several hundred gigabytes every
> > > morning to a remote site. But we need near live backups incase we had
> > > a total meltdown at the other site.
> > >
> > > Regards,
> > >
> > > --
> > > Mike Brancato
> > >
> > >
>